STRUCTURE
RCC framed structure with RC foundations confirming to BIS compliance to seismic zone requirements.
Anti-termite treatment as per BIS for the complete building.
8' thick Solid Block outer wall and 4" thick Solid block internal partition wall with cement plastering.
WALL FINISHES
The toilet walls will be finished with double glazed ceramic tiles up to 7' height.
Toilets, Kitchen, Balconies and other areas will be finished with cement plaster and Tractor Emulsion.
Wash area will be finished with Ceramic Tiles up to 3'0 height. 2' above the kitchen platform will be finished with double glazed ceramic tiles.
Exterior faces of the building will be finished with cement plaster and Exterior Emulsion.
CEILING
All ceiling areas will be finished with emulsion paint.
FLOOR FINISHES
Living, Dining & Bedrooms will be finished with 2 x 2' Vitrified tiles with matching skirting. Kitchen, Balconies, Toilets & Wash/service area floor will be finished with Non slippery Ceramic Tiles.
All Lobbies and corridor will be finished with tiles.
Staircase will be finished with tiles.
Car park areas will be finished with cement concrete granolith flooring.
Driveway will be finished with interlocking Blocks.
DOORS & WINDOW
Entrance Doors: Hard wood frame with teak veneered shutter of solid wood in-fills. Yale or Godrej locks.
Bedroom Doors: Hard wood frame and skin paneled doors. Toilet Doors: Hard Wood Frame with FRP Doors.
Windows: UPVC windows with MS Grills as per the Design of the Architect.
French Windows: UPVC French doors as per the design of the architect.
KITCHEN
2' wide granite slab and a Stainless Steel single bowl Sink with drain board.
Provision for chimney and aqua guard will be made.
TOILETS
White European Water Closets of Kholer / Jaquar will be provided in all toilets. toilets will have provision for connecting a geyser.
Health faucets, wall mixer with an overhead shower will be provided in all toilets.
All CP fittings will be of Jaguar/Parryware continental range.
ELECTRICAL
Concealed Insulated Copper Multi-strand Finolex / QFlex Fire Resistant wires in all Apartments.
Each Apartment will be provided with a distribution board having MCB's.
All switches & sockets of Anchor / Legrand.
TV and Telephone Points will be provided in Living and Master bedroom, provision for the same in other bedrooms.
INTERNET
Conduit Provision given for Internet Connection in Living.
LIFT
The building will be served by Ten passenger lift of Johnson or Schindler Make.
POWER SUPPLY & GENERATOR
3 Phase Power Supply with Power Backup of DG for 1Light & 1 Fan point in each room of an apartment and for Common Facilities like Lifts, Pumps and Amenities will be provided.
A Few of the common lights shall be powered by solar energy.
SECURITY
CCTV Cameras will be installed in stilt lift lobbies, entry and exit gates.
COMMON FACILITIES
Common Toilet for drivers and domestic help would be provided in the stilt floor.
Sewage Treatment Plant will be Provided. The Treated Water will be Distributed to all EWC Flush Tank.
COMPOUND WALL
5 feet high compound wall on all sides of the plot.
LANDSCAPING
Suitable landscaping shall be done.
SUMP
Underground sump of adequate capacity would be provided.
BOREWELL
Bore well of required depth would be provided.
RAIN WATER HARVESTING
Will be provided as per CMWSSB Norms.