FOUNDATION & STRUCTURAL FRAME
RCC framed structure to withstand wind & seismic loads.
SUPER STRUCTURE
CC/CLAY/AAC/Any other equivalent material.
PLASTERING INTERNAL
External Walls
20mm thick Sponge finished cement plaster.
Internal Walls
12mm thick Smooth finished surface cement plaster/wall putty.
JOINERY WORKS
Main Door/Bedrooms Doors
Main Door frame: Engineered wood frame with laminated flush shutter (single) fitted with hardware.
Internal doors: Engineered wood frame with laminated flush shutter fitted with hardware.
Toilet & Utility Doors
Engineered wood with laminated flush shutter painted on both sides fitted with hardware.
Sliding Doors (for balconies)
2-track UPVC sliding doors.
Windows
3-track UPVC sliding doors with mosquito mesh.
PAINTING
External
Combination of texture and lappam finish with external emulsion paint as per architectural features.
Internal
Smooth cement finish with two coats of putty, one coat primer, and two coats of premium acrylic emulsion paint of best brands.
FLOORING
Living, Dining, Bedrooms, and Kitchen
600x600mm vitrified tiles.
Toilets
Ceramic tiles dado up to door height with anti-skid ceramic tiles for flooring.
Corridors
Anti-skid vitrified tiles.
Common Lobbies
Granite/vitrified tiles combination flooring as per design.
Lift Lobby
Granite/vitrified tiles combination flooring as per design.
Staircase
Up to 3 floors granite and the balance anti-skid tiles.
TILE CLADDING
Kitchen
Glazed ceramic tiles dado up to 2’ height above kitchen platform.
Toilets
Glazed ceramic tiles dado up to lintel height.
Utility and Wash
Ceramic vitrified tile dado up to 3’ height.
Lift Lobby
Granite/vitrified tiles combination flooring as per design.
KITCHEN/UTILITY
Platform & Sink
Granite platform with stainless steel sink.
Water Connections
Municipal water (GMC) as per availability along with bore well water. Provision for fixing of water RO system.
Exhausts
Provision for chimney exhaust and socket.
Utility/Wash
Provision for dishwasher & washing machine in the utility area.
TOILETS
Wash basins of architecturally approved brand.
EWC of floor-mounted or wall-mounted type as per approved architectural intent.
Provision for geysers, light point, and exhaust fan point in all bathrooms.
ELECTRICAL
Main
Miniature Circuit Breakers (MCB) for each distribution board.
Two 5 amps socket provisions for cable points.
3-phase supply for each point.
Bedrooms
Power outlets for air conditioners in the living/drawing and master bedroom. 5 amps socket provision for fan and light in all rooms.
Kitchen
Provision for power plugs for cooking range chimney, refrigerators, microwave oven, and mixer in the kitchen. Provision for dishwasher and washing machine in the utility area.
Toilets
Power outlets for geysers in all bathrooms. 5 Amp socket near the mirror.
TELECOM
Provision for Telephone points in Master bedroom and living room.
Provision for Intercom facility to all the units and connecting Security to the living room.
CABLE TV
Provision for cable connection in all bedrooms & living room.
INTERNET
One Internet socket provision in each apartment.
LIFTS
Passenger lifts with rescue device and V3F for energy efficiency with granite/tile cladding and one service lift. Lifts are designed as per architectural and engineering intent.
PARKING MANAGEMENT
Entire parking is well-designed to suit the number of car parks required. Parking signage and equipment placed appropriately to improve driving comfort.
Provision for car charging will be provided at 2 to 3 strategic locations.