STRUCTURE
Framed Structure: RCC framed structure resistant to wind & earthquake (Zone 2).
Super Structure: Solid cement concrete blocks for external & internal walls.
PLASTERING
Internal: Gypsum/Cement sand plaster for walls & ceilings.
External: Double coat plaster for RCC & masonry surfaces.
PAINTING
External: Textured/smooth paint finish of reputed make with two coats of weather shield exterior emulsion, HPL cladding as per facade details.
Internal: Two coats of emulsion paint of reputed make over smooth putty finish.
DOORS
Main Doors of 1200mm X 2300mm
Frame: 250mm X 75mm Teak wood frame with PU Polish.
Shutter: 40mm Flush shutter with 4mm Black forest veneer on both sides with PU polish.
Architrave: Front with 40mm X 12mm and back with 25mm X 10mm.
Internal Doors
Frames: 112mm X 75mm Solid wood frame with PU polish.
Shutter: 35mm Flush shutter with 4mm Black forest veneer on both sides with PU polish.
Architrave: Front with 40mm X 12mm and back with 25mm X 10mm.
Hardware: Yale Equivalent make.
FRENCH DOORS
UPVC sliding doors with clear glass of reputed make with provision for mosquito mesh.
WINDOWS
UPVC sliding windows with clear glass of reputed make with provision for mosquito mesh.
FLOORING
Drawing/Living/Dining/Family Lounge/Kitchen: 1600mm X 800mm vitrified tiles of reputed make.
Home Theatre/Master Bedroom: Laminated wooden flooring.
Other Bedrooms: 800mm X 800mm vitrified tiles of reputed make.
Open Terrace: Anti-skid vitrified tiles/Ceramic of reputed make.
Parking Area: Full body vitrified tiles of reputed make.
Staircase: Granite.
DADO
Bathrooms: Polished Glazed Vitrified Tiles (PGVT)/Glazed Vitrified Tiles (GVT) of reputed make up to lintel level.
Utility/Wash Area: Polished Glazed Vitrified Tiles (PGVT)/ Glazed Vitrified Tiles (GVT) of reputed make up to 4 feet.
RAILING
Staircase & Balconies: Internal staircase railing will be of SS/MS make & elevation railing will be of SS & glass.
KITCHEN
Kitchen ready to receive modular unit (client's scope).
Counter dado and sink are not included in the scope of work. Plumbing & electrical provision for water purifier, sink faucet.
Power sockets for cooking range, chimney/exhaust fan, refrigerator, microwave & mixer grinder.
LIFT
Structural provision with earthing will be provided. (Lift, electrical conduits, cladding, etc., is in the client's scope)
PLUMBING & SANITARY
All bathrooms polished chrome (CP) fixtures Kabler/Equivalent make.
Wash basin with hut & cold miser.
Single lever diverter with spout & shower.
Sanitary fixtures of Kohler/Equivalent make.
ELECTRICAL
Concealed copper wiring of reputed make.
Power sockets for AC in all bedrooms, living rooms, dining lobby & home theatre.
Power sockets for cooking range, chimney/exhaust fan, refrigerator, microwave, mixer grinder & water purifier in kitchen.
Power socket for washing machine & dishwasher in utility area.
Three-phase supply for each unit with individual dual-source energy meter.
Miniature Circuit Breakers(MCB) for each distribution board of reputed make.
Modular switchboards of reputed make.
EV charging: Provision for electric cars shall be provided for each villa.
Solar Heater: Provision for solar heater provided on terrace.
TV & TELEPHONE
Fiber connection to all units for internet, telephone & intercom.
Provision for DTH & TV services in all bedrooms, living rooms & home theatre.
Provision for telephone in all bedrooms and living rooms.
WATER PROOFING
Waterproofing for toilets, sit-outs, open terrace & terrace of reputed make.
POWER BACKUP
100% DG backup.
BILLING SYSTEM
Prepaid billing system for electricity, DG, water & maintenance.
SECURITY SYSTEM
Sophisticated round-the-clock security system.
Solar fencing throughout the boundary.
Intercom facility to all the units connecting to main security.
WATER SUPPLY
Centralized water distribution by hydro-pneumatic system for all villas with individual water meters.
WTP & STP
Water Treatment Plant (WTP) for bore well water supply.
Sewage Treatment Plant (STP) of adequate capacity as per norms will be provided inside the project along with UV filtration.
Treated sewage water will be used for landscaping purposes. Rainwater harvesting is provided to recharge groundwater levels as per norms.