1. Vaastu
100% Vaastu compliant
2. Structure (Basements)
Peripheral RCC Walls
Waffle-slab/Apartment-slab for the parking floors
VDF/IPS Flooring with slope
3. Super Structure
RCC Shear wall framed structure, earthquake resistant (Zone 2)
4. Lobby
Double height entrance lobby at podium level flooring in Granite. Wall cladding in Granite /Vitrified-tiles up to false ceiling level.
5. Lifts
Tower 1: 8 Nos Passenger Lift & 2 Service Lift (2.5m/Sec Speed)
Tower 2: 5 Nos Passenger Lift & 1 Service Lifts (2.5m/Sec Speed)
Tower 3: 7 Nos Passenger Lift & 2 Service Lifts (2.5m/Sec Speed)
Lifts - Toshiba / Mitsubishi / Hitachi / Schindler / OTIS or Equivalent
6. Flooring
Vitrified Tiles in Drawing, Living, Dining & Kitchen (2BHK-600x600mm; 3BHK-800x800mm) and all Bedrooms (600x600mm) + 75mm Skirting
Anti-skid Ceramic tiles in Balconies (1200x200mm) + 75mm Skirting
7. Kitchen and Utility
Vitrified Tiled Flooring (2BHK-600x600mm; 3BHK-800x800mm) and Ceramic-tile Dado over the Granite Counter up to 600mm optional)
Single Bowl Single Drain Steel Sink with CP Tap
Anti-skid Ceramic Tiled Flooring and Ceramic Tile Dado for the Utility (300x300mm)
Ceramic Tile Flooring and Dado in the Maid's Toilet (only in specific units) (300x300mm)
8. Toilets and Fittings
Anti-skid Ceramic Tiles / Glazed Vitrified Tiles for Flooring
Ceramic Tiles / Glazed Vitrified Tiles on Wall dado up to false ceiling
Ceramic Wash Basin in toilets (of any reputed brand)
Pedestal Wash Basins in maid Toilet (of any reputed brand)
Wall mounted WCs (any reputed brand) with Flush Valves in all bathrooms
Single Lever Tap and Shower Mixer (of any reputed brand)
CP Fittings (of any reputed brand)
Provision for Geysers in all Toilets except the Maid's Toilet
Suspended Pipelines in Toilets concealed within the PVC False Ceiling
9. Painting
Textured Paint on External Walls
Internal Walls and Ceilings in Acrylic emulsion
Enamel Paint on all MS Railings
Parking Areas - Cement Based paint
10. Railing
Living & Bedroom balcony - Glass Railing & RCC Parapet mix-1250mm high
AC Ledges railing - MS Railing 750mm high
Staircase Railing - MS Railing 900mm high
11. Common Area Finishes
Corridor Flooring - Vitrified Tiled Flooring (600x600mm)
Staircases - Natural stone
Garbage Collection room - Vitrified tiles 600x600mm
Lift Lobby Fascia 200 mm wide Granite band around the lift opening & rest of the area texture-paint
12. Doors and Windows
Main Door: 7'6" high - African Teak wood frame and Pre-Molded Flushed Shutter in Wood, with Veneer & PU polish on both sides
Internal Doors: 7' high - Engineered Wood Frame and Flush Shutters with Laminate
Balcony Sliding Doors: 7'6" high - UPVC/Aluminum Frames and Shutters with Performance Glass and track provision for Mosquito Mesh Shutters (of any reputed brand)
Windows (Sliding / Operable based on Ventilation Requirement): 5'1" high - UPVC/Aluminum Frames with Performance Glass and track Provision for Mosquito Mesh Shutters (of any reputed brand)
Kitchen to Utility door: 7'6" high - UPVC/Aluminum Frames and Shutters (operable) (of any reputed brand)
Ventilators: 4' High (Regular) / 5'1" High (where we access AC ledges) Operable - UPVC/Aluminum frame & glass with the Provision for Exhaust fan
Doors - Fittings & Locks (of any reputed brand)
13. Electrical
Concealed Wiring with PVC Insulated Copper Wires and Modular Switches
Sufficient Power Outlets and Light Points will be provided
Cable TV and Telephone Points provided in the Drawing, Living and Master bedroom
Provision for Installation of Split AC in the Living, Dining rooms and all Bedrooms
Individual Meters will be provided for all Apartments at respective floor level in the electrical shaft
HT Metering proposed
Power outlets for Electrical Appliances Power plug for cooking range, Chimney, Refrigerator, Microwave Oven, Mixer-Grinder in Kitchen, Washing Machine/Dishwasher in utility area
3-Phase Power Supply Connected load for 2 BHK, 3 BHK & Duplex as per consultant recommendation
Internet points in Living & Master Bedroom
14. Plumbing
Domestic water supply for toilets and kitchen (Hydro pneumatic)
Drinking water supply only to Kitchen (Hydro pneumatic)
STP treated water for flushing (all toilets) and landscaping (Hydro pneumatic)
STP/WTP/Sumps Capacity as per consultant recommendation
15. False ceiling
Corridor and Units - Corner Box false ceiling (Gypsum) proposed to cover the Fire and Water supply lines. Gas lines are open as per norms
16. Security System
Security Cabins at all Entrances and Exits with Peripheral CCTV Coverage
CCTV at vantage points. Entry lobbies, basements entry and exits, Project Entry and Exit, Sports areas, Clubhouse Entry and Exit, hidden areas in parking as per consultant recommendation
Typical floors - CCTV proposed in the lifts
Access Control System (provision) for Clubhouses, Main Entry/Exit passages
Boom barriers proposed
17. Gas
Piped-Gas provision for all apartments. Gas banks at podium level
18. DG Back up
100% DG backup proposed for all apartments except ACs & Geysers
19. BMS Services
Prepaid Electricity and Water Meters provided for all apartments