STRUCTURE
Super Structure RCC "Structural Shear Wall System" designed to withstand wind and seismic loads as per IS Codes.
Non-structural Walls RCC Walls / Block Masonry where required as per design.
FLOORING
Living, Dining, Kitchen & All Bedrooms: Glazed vitrified tiles of reputed make as per design intent.
All Balconies: Anti-skid vitrified tiles of reputed make as per design intent.
Corridors: Vitrified tiles of reputed make as per design intent.
Staircase: Granite / Natural Stone.
WALL FINISHES
Internal Walls: Smooth putty finish with 2 coats of premium acrylic emulsion paint of Asian make or equivalent over a coat of primer.
External Walls: Textured finish and two coats of exterior emulsion paint of reputed make.
TILE CLADDING
Bathrooms: Glazed/matte finish ceramic tiles dado up to 7' height.
Utility Area: Ceramic tile dado up to 3 feet height and flooring with matte finish.
KITCHEN
Provision for municipal or bore well water.
Water meters for each flat.
BATHROOMS
Anti-skid ceramic flooring tiles of reputed make.
Duravit or equivalent sanitary ware.
Premium quality wall-mounted EWC of Schell flush valves or equivalent.
Grohe or equivalent bath fittings.
Provision for geysers in all bathrooms.
Metered water supply to all flats.
TELECOM
Telephone point in the living room.
ELECTRICAL
Power outlets for air conditioners in the living, dining, drawing, and bedrooms.
Power outlet for geysers in all bathrooms.
Power plug for hob, chimney, water purifier, exhaust fan, refrigerator, microwave oven, mixer/grinder & dishwasher in kitchen & washing machine in utility area.
Three-phase supply for each unit and individual meters.
Miniature Circuit Breakers (MCB) for each distribution board of reputed make.
Modular switches of reputed make.
CABLE TV
Provision for high-speed internet connection in the living and master & children’s bedroom.
INTERNET
Provision for high-speed internet connection in the living and master & children’s bedroom.
UTILITY/WASH AREA
Provision for washing machine, dishwasher, and wet area for washing utensils, etc.
DOORS
Main Door: Frame - 8' engineered wood seasoned kiln dried frames with PU polish. Flush door with solid wood rail and style with both side veneer with PU polish.
Internal Door: Frames - engineered wood seasoned kiln dried with PU polish. Flush door with solid wood rail and style with both sides laminate.
French Doors: UPVC door frames with float glass panel sliding shutters with provision for mosquito mesh track.
Windows: UPVC window glazing system with sliding/casement shutters with provision for mosquito mesh track.
LPG
Provision for LPG piped gas system.
GENERATOR
100% D.G backup with acoustic enclosure.
SECURITY/BMS
Sophisticated round-the-clock security/surveillance system.
Surveillance cameras at the main security and entrance of each block to monitor.
Panic button and intercom facility in the lifts connected to the security room.
Barbed wire or solar power fencing around the compound.
LIFTS
Passenger high-speed automatic elevators of Mitsubishi make for each block with rescue device & with V3F for energy efficiency & with granite/tile cladding for the lift entrance.
Service elevator of Mitsubishi make for each block with rescue device & with V3F for energy efficiency & with granite/tile cladding on the lift entrance.
ADDITIONAL AMENITIES
Common charging points for electric cars shall be provided.
Fully treated water will be made available through an exclusive water-softening plant.
Hydro-pneumatic system for pressure water supply on all floors.
A sewage treatment plant of adequate capacity inside the project. Treated sewage water will be used for landscaping and flushing purposes.
Rainwater harvesting at regular intervals is provided for recharging groundwater levels.
Fire hydrant and fire sprinkler system on all floors and basements.
Fire alarm and public address system on all floors and basements.