R.C.C. FRAMED STRUCTURE
R.C.C. Framed Structure to withstand wind and seismic loads.
SUPERSTRUCTURE
Clay moulded first-class brick masonry in cement mortar.
PLASTERING
Internal: Double coat cement plaster with smooth finishing.
External: Double coat sand-faced cement plastering.
PAINTING
Internal: 2 coats of good quality emulsion paint over putty finished surface.
External: Texture finish and weatherproof emulsion paints based on the elevation design.
FLOORING
Living, Dining, All Bedrooms & Kitchen: Double charged vitrified tiles of reputed brand.
All Balconies: Rustic finish vitrified tiles of reputed brand.
Bathrooms: Glazed ceramic tile dado of reputed brand up to 7'-0" height.
Utilities: Tiles dado up to 3'-0" height in utility/wash areas.
DOORS
Main Door: Teak wood frame and aesthetically designed teak veneer doors with good quality hardware.
Internal Doors: Sal wood door frames with teak veneer shutters, with good quality hardware.
French Doors: UPVC door frames with float glass-paneled sliding shutters with mosquito mesh.
WINDOWS
UPVC windows with clear glass, provision for mosquito mesh track with safety grills.
GENERATOR
Adequate DG set backup for each flat and common areas.
UTILITIES/WASH
Provision for washing machine/dryer and wet area for washing utensils.
BATHROOMS
Premium quality ceramic wash basins, wall-mounted EWC, concealed flush tank, and single lever C.P. fittings of reputed brands. Provision for geysers in all bathrooms.
ELECTRICAL
Concealed copper wiring in conduits for lights, fans, and power plugs of HPL/Equivalent make. Power outlets for air conditioners in all bedrooms. Power outlets for geysers in all toilets. Power outlets for cooking range, chimney, refrigerator, microwave ovens, mixer/grinders in kitchen. MCBs for each distribution board of Legrand/HPL/Equivalent make. All flats equipped with modular switches of Legrand/HPL/Equivalent make.
TELECOM/INTERNET/CABLE TV
Telephone points in living room and master bedroom. Intercom facility to all units connecting security and neighborhood. Provision for cable connection in living room and all bedrooms. Provision for internet connection in living room and master bedroom.
LIFT
Lift of Kone or equivalent make with front granite cladding and rich interiors.
STP
A sewage treatment plant of adequate capacity as per norms will be provided inside the project. Part of the treated sewage water will be used for landscaping and flushing purposes.
RAIN WATER DISPOSAL
Rainwater from the terrace and open areas will be collected through rainwater pipes and discharged into the rainwater harvesting pits to recharge the groundwater.
SECURITY
Solar-powered security fence for the total compound. Surveillance cameras at the main security and entrance of each block for monitoring.
PARKING MANAGEMENT
The entire parking is well designed to suit the number of car parks, with parking signage and equipment at required places to ease driving.
PARKING
Each apartment will have one car parking.