STRUCTURE:
The building will have an R.C.C. framed structure with solid cement blocks, with 6" external and 4" internal walls.
PLASTERING:
The internal and external walls will have well-finished plastering throughout.
PAINTING:
Emulsion paint will be used for the intrenal walls, weather proof paint will be used for the external walls.
FLOORING:
The living, dining, bedrooms, and kitchen will have vitrified tile flooring. Ceramic tile flooring will be used for balconies and utility areas, with 3 feet ceramic tile dado for the utility area. Anti-skid ceramic tiles will be used in all toilets, while the lift lobby and corridor will have vitrified/Granite flooring.
PLUMBING & SANITARY FIXTURES:
Ivory/white pastel-coloured EWC hand wash basins of Bath sense/Parry ware or Jaquar/Ess or equivalent make of bathroom fixtures will be used in all toilets.
KITCHEN:
The kitchen will have a polished granite platform with a stainless steel sink. A provision for water inlet near the kitchen sinks will be provided for a water purifier. Premium quality ceramic tile dadoing up to 2 feet above the kitchen platform will be provided.
HARDWARE:
Quality locks will be used forthe main doors & bedrooms.
ELECTRICAL WIRING:
The wiring used will be of Anchor, Great White, or a similar quality brand.
SWITCHES:
All switches shall be of Anchor/Great White or equivalent.
CONNECTED POWER:
The connected power will be 3 KVA for 2 BHK and 4 KVA for 3 BHK ELCB/MCB by Legrand/Indo kappa or equivalent.
DOOR & WINDOWS:
The main door will have a teak wood door frame with an HDF moulded panelled shutter. The bedrooms will have a hardwood door frame with an HDF moulded panelled shutter. The sliding doors and windows will be made of aluminium or UPVC. The toilets will have aluminium ventilators with a provision for an exhaust fan.
WATER SUPPLY:
Water supply will be from a borewell.
ELEVATORS & STAIRS:
An automatic elevator by a reputed company will be provided. Stairs will be provided with MS railings.
GENERATOR:
There will be 100% backup power For common areas and backup power of 0.3 KVA for 2 BHK & 0.4 KVA for 3 BHK.